Each procedure, every segment, each operate in EPG is demanded to be carried out one particular stage following yet another, meticulously and cautiously, from substance choice, reformation to manufacturing accessories, from elements warmth treatment to automatic assembly, from good quality manage to item inspection and screening and from get working to following product sales services. More importantly, we make unique elements according to supplied drawings/samples and warmly welcome OEM inquiries. specialize in electrical power transmission merchandise, CATV goods, mechanical seal, hydraulic and Pheumatic, and promotional items. Keywords and phrases colon Shovel loader comma Wheel Loader comma entrance loader comma loaEPTfor sale comma wheel loaEPT3ton
Our advantages colon
-We produce most of the elements in our possess factory comma greater to manage the quality comma easier to get parts in the EPT
-True warranty for top quality colon we will give components as totally free within warranty if high quality difficulty
-EPT encounters in this market colon we began to exporting loaders from year 2008 period of time
Attributes of this model 3ton loader colon
1 rpar The wheel loaEPTuses XiHu (West Lake) Dis.hu (West Lake) Dis.feng EPT engine with significantly less oil intake comma reduced sounds and small emissions interval
two rpar EPT and torque converter of 5 ton wheel loaEPTare of good applicability interval
three rpar Optimally made operating unit and frames of wheel loaEPTare more powerful and much more durable period
4 rpar EPT duty unloading EPT system improves the EPT wheel loaEPTperformance period of time
five rpar The wheel loaEPTuses greatest EPT cylinders comma pumps and valve time period
Specifics colon
1 rpar EPT motor comma 130HP comma 6 cylinders comma 4 strokes comma h2o cooling comma turbocharged comma EPT warranty time period ZL50 planetary type EPT with EPT converter comma 2 EPT and 1 reverse speeds comma exact same as 5ton wheel loader comma more robust for weighty responsibility period of time EPT EPT change time period EPT axles with caliper sort services brake interval
two rpar The robotically welded two-piece structural body design and style supplies a rugged and reputable foundation for the EPT that increases steadiness comma performance comma and serviceability time period A sturdy articulating hitch program joins the entrance and rear frames improving longevity period Enhanced line routings throughout the hitch joint streamline the producing process and enhance trustworthiness and longevity time period
three rpar EPT structural components are all developed by EPT time period All the areas are higher top quality welded period of time The ball blasting and vibration treatment method can release the welding tension period of time UT lparEPT Testing rpar to inspect the welding defect interval It will form a great deal of small pits on the area after blasting and it will increase the paint adhesion interval
four rpar The powerful axle employs a main EPT and two hub EPTs which are related by two shafts interval The primary EPT uses EPTl EPTs and the hub EPT utilizes earth EPTs interval Dry variety caliper brake makes use of a brake shoe with a brake disc time period It is better for routine maintenance and radiation period of time
5 rpar The radiating region of the high good quality radiator is additional for greater radiation time period The temperature of the engine and the EPT can be managed unEPTthe temperature boundaries period It extends the services existence equally of the motor and the EPT interval And it decreases the oil leak of the hoses and meanwhile the service lifestyle of hoses is extended also time period
six rpar Luxurious cabin is geared up equally air conditioner and electric powered admirer period of time Radio with SD card interface is stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd period The spacious cabin assures the relaxed operation and relaxation atmosphere for the operators interval
seven rpar One EPT EPTstick handle is optional period The EPTstick can be moved EPT and back to control the increase lifting and down interval The EPTstick can be moved still left and rigEPT to control the bucket dumping and loading time period It is easy for procedure and the effectiveness is much higher than the two EPT control technique interval
8 rpar The steering wheel placement can be a little modified period The instrument panel consists the meter of water temperature comma the meter of oil temperature comma the meter of gas stage comma the meter of air pressure and the counter of working hrs period of time The switches for lights are mixed in the panel too period
Optonal attachments
-coal bucket
-rock bucket
-swift adjust hitch
-wooden grapple
-grass grapple
-pallet fork
Loading and deal
-one particular device for every 40HQ container or 2 units in a 40HQ and a 20GP containers
-disassembling cabin and bucket
-cabin in a steel frame
-primary human body EPTd into container directly
-fastened with expert steel ropes
Warranty and servce colon
1 rpar 1 year warranty for EPT EPT interval
two rpar All spare areas are available as we produce most of the components in our manufacturing unit interval
three rpar We can provide complex assist via mail comma telephone comma online video or sending engineers there interval
4 rpar EPT procedure and upkeep manul and components checklist are shipped with the loaders period
Our products assortment colon
We generate wheel loaders with bucket ability from 1 period8m3 to 3m3 time period
We also generate excavators from 1 period8ton to 42ton interval
All EPTs are CE certificated period
Our manufacturing facility tour colon
We make most of the components and it is better for high quality handle system interval And it is simple to get the spare components from us immediately as well period of time
Technical specs colon
Fundamental Information | |
Bucket potential | one period8 m sup3 |
Rated load | 3200 kg |
Operation bodyweight | 12440 kg |
Dumping height | 3060 mm |
Dumping achieve | 1008 mm |
Breakout pressure | 97 kN |
Traction pressure | 100 kN |
Wheel foundation | 2750 mm |
Overall EPT cycle time | ten period3 s |
Complete bucket lifting time | 5 period6 s |
Min interval turning radius | 5376 mm |
General dimension lparL timesW timesH rpar | 6970 times2450 times3228 mm |
Motor | |
Model | CUMMINS 6BT5 period9-C130 |
Rated EPT | ninety seven kw |
Rated velocity | 2200 rpm |
Max interval torque | 560 N periodm |
Fuel intake | 225 g solkw periodh |
EPT Program | |
Gear box sort | planetary EPT shift |
EPT pace I | 12 km solh |
EPT speed II | forty km solh |
Reverse pace | 17 km solh |
Torque converter sort | solitary phase 4 factors |
Axle sort | 4-wheel EPT |
Tire measurement | 17 period5-25-12PR |